Later this year the nation’s first “integrated” wind and solar hybrid project will begin producing power outside a small city in northwest Minnesota. Developed by Juhl Energy, Inc., the Red Lake Falls Project combines two 2.3 megawatt (MW) General Electric 116-meter rotor turbines with a 1 MW solar photovoltaic installation. Dan Juhl, the company’s founder, said it will be the first project in the country to use wind integrated solar energy (WiSE) allowing turbines and panels to share a converter, which transforms electrical direct-current voltage for use on the grid.